Building a custom home or chalet in Argenteuil

Slopes, septic and wells, private roads, shorelines: what to check before building in Gore, Mille-Isles, Wentworth or Lachute.
Published on
Nov 26, 2026
Le Sommet, a home built by SIT Construction in Grenville-sur-la-Rouge

Gore, Mille-Isles, Wentworth, Lachute, Brownsburg-Chatham: eastern Argenteuil is 20 to 35 minutes from our base in Saint-Jérôme and part of our regular territory. We build custom homes and chalets here and take on major renovations. We have also built further west, such as Le Sommet in Grenville-sur-la-Rouge. You deal directly with the owner of the company, in English.

Lots here are large, wooded and often steep, far from municipal services. This is what to check before you buy a lot or sign anything.

What changes the budget and the schedule in Argenteuil

  • Septic and well, almost everywhere. Outside Lachute and the village cores, there is usually no municipal sewer or water. You need a septic system and a well, each with its own permit, from about $25,000. Soil type and well location often decide where the house goes.
  • Steep slopes. This is where the Laurentian relief begins. In Gore, for example, work in a steep-slope zone requires its own application. A steep lot can add blasting, retaining walls or a taller foundation.
  • Access. Many lots are on private roads. In several towns, the lot must front on a compliant public or private road to get a permit. Also check that the road can take concrete trucks and is maintained in winter.
  • Lakes and shorelines. Since March 1, 2026, a modernized provincial framework governs work near lakes, streams and flood zones. A new home cannot be built in the littoral zone. Quebec’s rules (in French).

How we run your project

  • One contact, in English: Simon Théberge, owner of SIT Construction, from the first call to the keys.
  • A detailed estimate before you commit, line by line.
  • Progress updates every week, with photos: useful when you don’t live on site.
  • Five inspections at key stages: after excavation, after the foundation is poured, once the frame, windows and roof are done, before the walls are closed, and at completion.
  • Every document explained in English. Quebec law requires contracts and permits in French first; we walk you through each page.

What it costs

Based on our projects, a two-storey home or chalet runs about $230 to $285 per sq ft, a single-storey about $330 to $385 per sq ft, and high-end projects from $425 to $650 per sq ft and more. Before taxes, land not included. For chalets specifically: custom chalet builder in the Laurentians.

Towns we serve

Gore, Mille-Isles, Wentworth, Lachute, Brownsburg-Chatham and Saint-André-d’Argenteuil are part of our regular territory. Further west (Harrington, Grenville, Grenville-sur-la-Rouge), we look at each project case by case. See also: building in the Pays-d’en-Haut.

Licensed with the Régie du bâtiment du Québec (RBQ licence 5637-1594-01) and accredited with the Garantie de construction résidentielle (GCR), Quebec’s new-home warranty plan.

Conclusion

Looking at a lot in Argenteuil?

Send us the address or the listing. We’ll check access, slope, soil for the septic system and the shoreline, and tell you what it will take to build there.

Share this post
1. Do you build in Gore, Mille-Isles and Lachute?

Yes. Eastern Argenteuil is part of our regular territory, 20 to 35 minutes from Saint-Jérôme.

2. What about Harrington or Grenville?

Case by case. We have built in Grenville-sur-la-Rouge. We look at the size of the project and site access. Several homes in the same area is a plus.

3. Can you look at a lot before I buy it?

Yes, and it’s the best time to call. We check access, slope, septic, well and shoreline. Send us the listing.

4. My lot is on a private road. Is that a problem?

Not necessarily. The road must be recognized by the town for the permit, and it must let trucks through during construction.

5. How long does it take?

A typical build takes four to six months from excavation to keys, depending on size, design and site conditions. Allow time for the septic and well permits first.

6. Are your contracts in English?

Quebec law requires that we give you the French version first. We explain every clause in English, and you sign only when everything is clear.